Wednesday, 20 August 2014

More building grounds...

So we were a little bit stuck at this point, for two reasons; which company should we choose to build our house? And where should we build our house? It might have seemed obvious from previous posts that we wanted to build in Hasselager, but we were not 100% sure, just because every bit of money we could save on the ground could be used on the house instead.

We found some more building grounds in Hasselager, just north of where we had previously looked. These were a bit cheaper, and there were a handful of grounds left. But, we could see there was a remark on the datasheets of all grounds, stating that a lot of earth needed to be removed before the house could be built. To help us find out how much this extra ground work would cost, we decided to contact the salesmen from Eurodan and HusCompagniet.

Both salesmen told us that it would cost a lot of money, and we were advised not to choose the grounds. But, the difference in the two companies became apparent. The Eurodan salesman simply told us to not choose the ground, and look elsewhere. But the HusCompagniet salesman also began to help us look for other grounds, offering advice and generally being more helpful.

We had a look around other places in or near Aarhus for building grounds. As I’ve said before, there weren’t many grounds, which were within our budget, and the ones in Aarhus that we did find didn’t have the water, drain and electricity connections in place already. So what should we do? We decided that perhaps it was time to look outside of Aarhus (the wife was not keen on this idea).

We looked at the grounds that HusCompagniet had suggested, plus a couple of others we had found ourselves, where some were in Solbjerg and some were in Horsens. Both of these towns had cheaper building ground than Aarhus, which was a big plus. But after a lot of thought, we realized that we just wouldn’t be happy moving to a town we didn’t know, with people we didn’t know. So we decided that Aarhus is definitely where we wanted to spend the foreseeable future. But should we build in Hasselager?

Tuesday, 5 August 2014

Eurodan huse: First meeting

As we had done many times before, we went looking at show houses again in May. This time, we found one in Odense by the company Eurodan Huse. The house we looked at was about 150 sqm and had a nice layout. This was a couple of weeks before we had our first meeting with Huscompagniet. We got chatting to the salesman, who of course said that we should make sure that if we have quotations from other companies, that they include all costs! It got us thinking, is there something that Huscompagniet might not include? 

We decided that, just to make sure we were getting the best deal, we should have a meeting with another company, so I got in touch with the Eurodan Huse salesman and booked a meeting just a few days after our wedding (was that a good idea?), which was just over a week after our meeting with Huscompagniet.

I'm not gonna go through the house price details, but I'll say that the basic house price was a little more, the garage price was a little more, but all the other extras were a little less. Overall, the price was nearly the same as Huscompagniets. But, what was really impressive is that Eurodan Huse also included all the bank, lawyer, building inspector costs into their budget. And, they also went through a calculation to show all of our monthly incomings and outgoings, just like the bank (nice to see that they also came to nearly the same figures as the bank, in terms of what we would have left to ourselves after the bills)! So their total price, for EVERYTHING was 3,201,000. Almost exactly what the bank said we could borrow. 
What was also really interesting about Eurodan's quote, was that they said we should use solar panels and a district heating system (fjernvarme in Danish) to meet the low energy requirements. This worked out cheaper than the geothermal solution Huscompagniet suggested. One negative though. The Eurodan Huse house and garage were a little smaller than the Huscompagniet one (150 sqm and 52 sqm respectively).

Now we were really in doubt of what to do. Two companies, with almost the same price, and perhaps Eurodan Huse have the edge due to their amazing quotation. What should we do?

Saturday, 2 August 2014

HusCompagniet: First meeting

So we had our first meeting with Huscompagniet at their Horsens office in May 2014. And it was a great meeting. The salesman, who we had dialog with via email, explained to us the low energy requirements necessary for the house. This meant that we would need some sort of system that uses natural resources to help heat the house. In our case, he suggested a ground heat exchanger system (jordvarme in Danish), with hoses buried in the garden, and a geothermal heat pump to collect heat from the ground for the house.

We then went through what size and shape house we wanted, and finally all the things we would like in the house (remember all those extra features I mentioned). We decided that we would like an angle shape house (vinkelhus in Danish), 152 sqm in size, which was actually a campaign model they had, and that we would like a hipped roof (at least I think that's what it's called in English. Just means that all sides of the roof are angled. Its called valmtag in Danish). 

Then we went through the extra features we would like (this is what bumps up the price). I'll list them below, so others know what it costs. 

  • The basic house cost: 1,399,000
  • 54 sqm Double garage with electronic doors, and extra side door: 269,800
  • Angled roof in the kitchen: 29,500 
  • Black aluminium windows: 18,0000
  • Plaster board ceilings (not standard in houses in Denmark, is in the UK): 37,240
  • Acoustic panels on the kitchen ceiling: 7,500
  • Wall hung toilets: 5,000
  • Extra money for HTH units (kitchen, bathrooms etc): 40,000
  • Extra money for white goods: 15,000
  • Extra money for electrical installation: 15,000
  • Money for ground works: 50,000
  • Extra insulation (to meet low energy requirements): 15,000 
  • Geothermal installation (exchanger, hose in garden etc): 94,000
  • Total cost: 1,995,040dkk
Let me also explain that Huscompagniet provide initial budgets of 77,300dkk for use on HTH units, and 19,000 for use on white goods, but most people choose to increase those budgets, like we have (40,000 and 15,000 respectively).

So, this is what we came to as a budget;
  • House price: 1,995,040
  • Ground price: 950,000 
  • Water and electricity during build: 20,000
  • Disposal of removed earth: 10,000
  • Garden budget: 50,000
  • Total house & ground cost: 3,025,040dkk
This, was almost spot on the initial budgets we had calculated for the ground and house. With a total budget of 3,200,000 from the bank, we had nearly 200,000 for all other fees like bank charges, lawyers etc. Plus, we got everything we wanted in the house!! The dream was looking more and more achievable, but were we ready to actually start such a monster of a project?

Friday, 1 August 2014

HusCompagniet: First email dialog

So after the meeting at the bank, we needed to get a much better idea of how much our new house could cost. Each building company has a list of various template houses you can choose from. From this, you can move all the internal walls around as you want, plus you can add lots of extra features to personalise the house. On some of the building company websites, it's also possible to see the prices for the basic house. An example of this can be seen here. What we really liked about Huscompagniets website, was that all of the show houses have details of what extra features were added, and in most cases, how much the extra features cost. You can also see the complete house price with the particular ground they were built on. From this, we thought we should speak to Huscompagniet.

At the end of April 2014, I received an email from the salesman we had spoken to at the Huscompagniet house in Ry, just as a follow up. I thought this would be a great opportunity to start asking about the costs involved with building a house, as we weren't sure exactly how much it costs, or if there were loads of hidden costs in the background. But for this, he would need an example building ground. This is where the building grounds in Hasselager came into play.

Our thoughts were this; we would use approximately one third of our bank budget on the building ground, and the rest on the house (3,200,000 in total, so 1,000,000dkk for the ground, 2,000,000dkk for the house, and the other 200,000dkk would be swallowed up by bank, lawyer and building inspector fees). The available grounds in Hasselager were on a street called Vangsbovej, and the cheaper grounds were in the region of 950,000dkk, perfect! I sent the ground details to the salesman, and he quickly let us know that there are other costs in the background when building a house. So the grounds aren't fully ready for building on then? 

Well it turns out that of course, ground work is required for the house foundation. And the builders need power and water to build the house. Oh and the building permit application costs something. Everyone needs a garden right? That of course costs money to... And, there are requirements that all new houses in Denmark must meet a low energy efficiency level (energiklasse 2015), which requires extra costs for the house. Wow, that is a lot of extra things needed for building a house! So how much does this all cost?.

  • Ground price: 950,000
  • Ground work: 50,000
  • Power & water: 20,000
  • building permit application: 4,000
  • Garden: 50,000
  • Energiklasse 2015: 110,000
  • Total cost: 1,184,000dkk
It was then that it really started to sink in that there are lots of other costs that we didn't know about. But if we really wanted to know how our new house could be, with our budget and the example ground we chose, we needed to have a meeting with the salesman...