Sunday, 28 September 2014

Solution to our ground issues

So near the middle of September, we heard that the local council rejected Huscompagniets proposal of raising the house 80cm over the current ground height, so 30cm over the limit. This meant that Huscompagniet needed to go back to the drawing board...

However, they came up with a great solution. Why don't we have the house on two different levels? As mentioned in this post, the part of the house, which was over the ground raising limit, was the living room/roof overhang. So what if we lower this part of the house, so that the living room is sunk below the main part of the house? The wife and I thought it sounded like a great suggestion, but we of course wanted to see some drawings...

A couple of days later, we received some new drawings from Huscompaniet, with the main part of the house raised 20cm above the living room, and we thought it looked great! Here is a couple of pictures, of how the interior could look.

 photo Sunklivingroom13-09-14.jpg
And here is a 3D view of the house, where you can see the living room lower than the rest of the house.
 photo 3Dview13-09-14.jpg
The only minor issue with such a change to the house, is that it increased the cost of the foundation works. Originally, it was 50,000dkk. But now, the ground works would cost 86,000dkk in total (this amount comprised of 73,000dkk for the foundation work, and 13,000dkk for the extra brick work and wall heights. But we thought this extra money was worth it, as it gives a unique feel to the house, plus we get a living room with a 20cm higher ceiling!

So, being happy, we agreed to let Huscompagniet send the drawings to the council, to see if they approved. So all we could do, was wait for their response, and see if they would grant us the building permit so we could start building...

Wednesday, 24 September 2014

Not quite as flat as we hoped...

Well... We found a little issue with our ground. Ok, I say issue. It's not a big issue, but we found that the ground was not quite as flat as we had hoped. It turned out that the initial placement that Huscompagniet proposed, could place the house too low on the ground. This meant, that three sides of the ground had a slight fall towards the house, which could result in rain water always running towards our house. Not so good.

HusCompagniet proposed that we raise the house up 30cms, but there was one minor issue with this. The living room and roof overhang part of the house, would be approximately 80cms over the original ground height (circled below in red). But, rules set in place by the council state that we can't raise or lower the ground by more than 50cms over the original terrain... Regardless, HusCompagnet asked the local council if we could, just this once, exceed the 50cms limit.

 photo Vangsbovej3384_34.jpg

Unfortunately, the local council said no.... So where could we go from here?

HusCompagniet third draft... Almost finished drawings!

Well there was quite a few emails sent forwards and backwards, but finally we managed to get the house drawn up exactly as we wanted it. Here it is shown below with the modified hallway, the extra wide bedroom and all the correct windows and doors! We also saw the first 3D view of the house, which gave it a new depth and made it feel real.

 photo Vangsbovej33thirddraft.jpg

Unfortunately, we found a little issue with our ground, something that we hadn't seen before. I'll wait until the next post to let you know what happened...

Sunday, 21 September 2014

HusCompagniet second draft

As I mentioned in the last post, the first drawings were not exactly right in relation to our ideas of how the house should be. I decided that it would be best to try and draw up the house myself first, before trying to scribble all over HusCompagniets drawings.

I found a really cool website called roomsketcher.com, where you can draw up your own house in 2D, and even add all the doors, windows and furniture! So I went to work, and tried sketching exactly what we wanted our house to look like. I had to bear in mind, that we were limited to 152 sqm for the house, and 54 sqm for the garage. I found out that it would be best to actually make the house shorter and wider than that shown in HusCompagniets first draft. That way, we can elongate the master bedroom, bathroom and walk-in section (mainly for the sake of the walk-in, so I'm keeping the wife happy). After sending my ideas to HusCompagniet, they returned with this.

 photo 2c5fcf6b-3be2-437c-b21a-a3a09a4e9436.jpg

This design was looking much better, but we still wanted to adjust a couple of things. The master bedroom wasn't wide enough as the bed couldn't fit between the windows, and the hallway now had a strange shape. It wasn't exactly what I had drawn up, and why was there a strange angled wall for the door to the office? It was time to have another quick chat with HusCompagniet to see if the last few details could be sorted out.

HusCompagniet first draft

After our second meeting at Huscompagniet in July 2014, it was all a bit quiet for a few weeks due to the summer holidays. But then one day in the beginning of August, we received the first draft of the house drawings, and how it could look on the ground.

So the first drawings weren't exactly what we had imagined the house could be, but it was a starting point for us to fine tune to our liking. Here is the first draft that we received from HusCompagniet, and here is a link to a pdf version. photo 5975c19b-7a86-4eaa-ad80-c6cf69f1bafb.jpg


The parts of the house, which we want to modify a bit is the main bedroom, bathroom and walk-in area, plus see if we can reduce the size of the hallway, and use as much space in the bedrooms and office as possible.

Sunday, 7 September 2014

Kitchen and bathroom inspiration

After signing the contract for our new house, and getting the all clear from the bank, we were getting very excited about our new home... But we were also a little impatient, and wanted to start designing how our house would look on the inside.

One of the first areas we looked at was the kitchen and bathrooms. Here is a couple of inspiration pictures from HusCompagniets website, which is of the style we think we will go for in our house. We like the idea of light flooring to help make the rooms feel bigger, plus it's not so easy to see dust on light flooring. We also love the idea of having most of the kitchen in light units, but maybe one section in black so it doesn't feel too clinical.

 photo 3e6ad45f-628d-4591-bb84-89ce4af4184b.jpg

 photo 5b4dd2fa-c0b8-4596-8f5e-587b51152018.jpg

Saturday, 6 September 2014

New meeting with the bank

We thought that after signing the contract for HusCompagniet to build our house, that we should let the bank know straight away (wouldn't be great if the bank didn't want to lend us the money). We arranged a meeting with our advisor in July 2014, just to double check all the figures, and to make sure the bank were happy with HusCompagniets budget.

We began discussing how much the loan would cost us every month, plus went through all other bills and expenses we would have to pay. We calculated that we would have approximately 16,000dkk left to ourselves every month after all bills, and we were really happy with that! It's less than what we're used to now, but your lifestyle is a little different when you have four walls and a roof over your head that you own. 

So the next big question was this. Do we go for a fixed rate mortgage, or a variable rate mortgage? I think the safe option (and the one we'll go for) is the fixed rate mortgage. But at the moment, we can see that it will cost us an extra couple of thousand a month to have the fixed rate mortgage. We don't have to decided anything until we actually pay for the house, which is on the date the house is finished.

But overall, the bank were behind us and were happy to give us the money for our dream house (that's a relief). Now we had to begin all the paperwork to get the bank loans ready, which meant preparing a bank guarantee, taking out life insurance (more money) and have a temporary loan set up so we could pay for the ground. 

This was beginning to feel all very surreal, and we couldn't wait to actually see our house being built. But unfortunately, there was quite a few other things that needed to be finalised first...

Friday, 5 September 2014

HusCompagniet - Second meeting

So, we found and reserved a ground. Now it was time to find out what exactly we could build on it. We had a think about which company we should ultimately choose to have a meeting with again, and because he had not heard anything from Eurodan Huse since the first meeting, plus because HusCompagniet had been very helpful, we chose to book a meeting with HusCompagniet in July 2014.

For the meeting, we went through almost the exact same things we discussed in our first meeting, but we decided (after being recommended by many people we had spoken to) that we would add a patio overhang (overdækket terrace). As standard, this feature comes with galvanized tubes to support the overhang, which doesn't look so nice. Instead, we decided to use brick supporting columns, which look much nicer. In all, this extension cost 39,700dkk. We also discussed using district heating, triple glazed windows and extra insulation instead of a geothermal heat pump in the garden, which was cheaper by around 50,000dkk. This was no problem for HusCompagniet to use.

As the salesman knew that we had spoken to Eurodan, he offered to make us a good deal. After a bit of discussion, we managed to get the extra 40,000 dkk we added to our HTH budget for free! Only condition was that we had to use all of it, so we wouldn't get the money back if we didn't use it all. But that was fine with us, and effectively meant that we got the patio overhang for free! And overall, the estimated house price was 1,946,740dkk, so actually a bit lower than the first meeting!

At the end of the meeting, we had a huge decision to make. The contract for the house was fully prepared and ready to sign, if we wanted to go with HusCompagniet. Shall we sign the contract now, and not go home and think about it? Will the bank be OK without us double checking with them first? We decided to take the plunge, and sign there and then!!! Scary!!! We had just signed our lives away on our dream house.

Straight away, we got an estimated moving in date... The 24th February 2014, and building work would begin some time in October 2014, amazing!

Next steps? Start talking about house drawings, final placement on the ground, HTH units, electrical installation.... Plus many many others things.

Thursday, 4 September 2014

A building ground with potential?

Wow, we had looked around at many building grounds in person, or on the internet, but now it was time to choose one. Where should we build our dream house?

Time and time again, we found ourselves coming back to the building grounds on Vangsbovej in Hasselager. There was so many good things about these grounds. They were close to the motorway, making it easy for commuting, they had local supermarkets, take aways, hairdressers and a large out of town shopping area in nearby Viby, the grounds were also reasonably big (some as large as 1400 sqm!). But most importantly for us, they were as close as we could get to Aarhus within our 1,000,000 dkk building ground budget.

There was one particular ground that was more appealing than the others to us, and that was number 33. It was a good size (1001 sqm to be precise), had great potential for optimal house placement, was at the end of the road, and also very importantly, had very minimal pavement outside the house. For those not in the know, it is law in Denmark that any pavements directly outside your house must be cleared of snow. And lets be honest, it's not a nice job shovelling snow. But for this ground, with minimal pavement, it would be an easy job!! 

To ensure others could see the same potential as us, we invited the wifes parents along one day to have a look at the ground with us. Their impression was just like ours, there was lots of potential for a great house here. 

So, what should we do next? We thought it would be interesting to contact Aarhus Kommune, and find out how difficult it is to reserve a ground, how much it costs etc. Well, as it turns out, we could reserve the ground over the phone, it costs nothing and we could keep it reserved for four weeks! With that, we reserved number 33 on Vangsbovej. Now, we could start to get excited... and panic!!