I'm an English guy living in Denmark after falling in love with, and recently marrying a beautiful Danish girl. We had a dream of buying our dream house after getting married... But then we heard about the idea of building our own house, and now we are hooked (well, perhaps me a little more than the wife)! This blog will follow our journey from start to end of the building of our new dream house.
Wednesday, 29 October 2014
The roof is on the way
Just a quick update. We went by the ground and saw that the carpenters have started preparing the walls for the roof trusses. Hope to see some of these roof trusses up by the weekend.
Friday, 24 October 2014
Walls are finished... Time for our first walk around the house!
Yesterday was a big milestone... All the inner walls are now finished, which means we are ready for the roof! And now we can get a much better feel for how the house will be when it's done. It's all very exciting!
And we thought that we'd make a little walk around video of the house. Apologies for the format, should have probably done it in landscape orientation, but you'll still get a good idea of the room layout.
Our house from the road.
The back of the house with living room and bedroom windows.
Utility room with a view through the garage to the road.
View from one end of the kitchen. Bedroom door to the left, living room iwith the step down and opening to the garden.
View from the living room to where the patio is going to be & from living room into the kitchen.
The small bathroom and hallway to our entrance.
The back of the house with living room and bedroom windows.
Utility room with a view through the garage to the road.
View from one end of the kitchen. Bedroom door to the left, living room iwith the step down and opening to the garden.
View from the living room to where the patio is going to be & from living room into the kitchen.
The small bathroom and hallway to our entrance.
And we thought that we'd make a little walk around video of the house. Apologies for the format, should have probably done it in landscape orientation, but you'll still get a good idea of the room layout.
Wednesday, 22 October 2014
The outer (inner) walls are done!
A quick update... All the outer walls (well, the inner part of the outer walls) are up! Here's what we saw today at the ground.
Monday, 20 October 2014
The walls are on their way up!
Tuesday, 14 October 2014
The foundation is finished!
Monday, 13 October 2014
Underfloor heating is ready!
The underfloor heating has been laid out in the whole of the house. Looks like they could be ready to mould the foundation tomorrow!




The driveway is ready! Well, ready for tiles...
The living room will be toasty warm
In this picture, you can see the doors to the two bedrooms (lower centre), the bathroom and the utility room (top left) and the office (top right)
These mofos were dug out of the ground. Should we keep some for garden ornaments?
Time for insulation on the ground
So again, we couldn't help ourselves. We decided to go by the ground again on Friday. This time, a load of new insulation had been laid down. Doesn't look like it'll be much longer before they put in the underfloor heating!



The house and the garage
The living room
Large channel in the insulation for heating pipes
More stuff happening
So on Thursday, whilst on the way home from work, we thought we'd go by the ground again, just to see what had happened. Not much had happened, but every little bit of progress is exciting right now!


The drive way is ready for gravel
More sand in the house
The plate compactor's called 'wacker'... Fitting name
Wednesday, 8 October 2014
Foundation work has begun!!
Wow, things are now picking up speed with the ground work. We went out to the ground today after work, and could see that there is no longer just a large pile of sand. The building company has now started with the foundation, and we can see all the outer block work of the foundation has been laid!
One thing I've read on a few blogs, is that you will always be surprised at how small the foundation looks, and that was very true of our house. But it is great to finally get a feel for how big everything is. Here's a few pictures of what we saw.





One thing I've read on a few blogs, is that you will always be surprised at how small the foundation looks, and that was very true of our house. But it is great to finally get a feel for how big everything is. Here's a few pictures of what we saw.
The garage! Can't wait to get my man cave. Just need to remember that I can't spend all my time in there.
Loads of pipes and cables for the utility room and bathroom
The roof overhang for our patio will be here
Our living room. The foundation wall for the walk in wardrobe can be seen in the lower centre of the picture. The wife thinks it's too small, but at 3 metres long, she should have plenty of wardrobe space.
These massive stones were dug out of our ground! I told the wife we'll use them as a garden feature. Don't think she was pleased...
Thursday, 2 October 2014
Digging has begun!!
So, after chatting to an internet company, we heard that there should be an internet/tv cable on our ground already. We thought that whilst on the way home from work, we would go by the ground to see if we could find such a cable. We found the cable no problem, so we don't have to worry about that later, but we also found that we have a digger on our ground, and a big pile of dug out earth!!
Here's what we saw.


Here's what we saw.
Action on the ground!
On Sunday the 28th Septemeber, we thought we would just go by our ground, as it might have been the last time we would see it before work begins. And when we arrived, we could see that someone from HusCompagniet had been by and marked out our house! This was great, as it was the first time we could see the size of the house in comparison to the ground. And it was clear to see, that our garden will be massive! Not quite sure if that's a good thing, or a bad thing yet... But anyway, we got proper excited!

The project plan for the build
In the last week of September, we got the building schedule from the project manager at HusCompagniet. Now we know when to go out to the ground, and see something happening. Finally, building work is about to begin. Can't wait!
Here's the plan.
Week 40, 41 & 42 Foundation
Week 43 Inner walls go up
Week 44 45 46 47 Carpenter
Week 48 First fix electrical and plumbing
Week 48 Roof tiles go on
Week 49 Internal brickwork
Week 49, 50 & 51 External brickwork
Week 50 & 51 Ceilings
Week 2 3 Laying floor tiles
Week 4 Painting
Week 5 & 6 Kitchen & bathroom fitting
Week 7 Flooring
Week 8 Energy measurement
Week 9 Delivery and hand over
Bring on week 9 next year!!
Response from HTH
So on the 30th September 2014, we finally had a response from HTH, after waiting a good 10 days after sending our first corrections to the budget. The main reason for correcting the budget, was to reduce the overall price.
Well, good news and bad news really. First the good news, we managed to get the overall budget down to 114,000dkk, which is just under our budget. But the bad news, was that there was many things that they didn't actually correct in the new budget, but instead questioned the things we wanted changed, and in one case, not modifying what we asked them to. For example, in the first budget, we decided that in our main bathroom, we wanted to have an 2m long 30mm thick sink. This was very expensive. For the second budget, we asked them to change the sink to a 1.8m long 10mm thick sink. Instead, HTH changed it to a 1.6m sink. Why? We asked for a 1.8m!!
If it took so long to get the response in the first place, and now the corrections haven't been made correctly, how long will it take to get the next reponse?
My view at the moment with HTH is this. I think they make really nice kitchens, but they are perhaps a bit overpriced. Also, as you can maybe hear, they take some time to respond to emails. And I can understand why they have questioned some of our changes, because perhaps they want to double check we are making the right decisions. But why not call and ask before sending out a new budget, which now needs to be corrected again!
Anyway, I am still looking forward to finalising our kitchen, as I think it will look nice when done. But I'm glad we have until the end of January 2015 to sort this all out...
Well, good news and bad news really. First the good news, we managed to get the overall budget down to 114,000dkk, which is just under our budget. But the bad news, was that there was many things that they didn't actually correct in the new budget, but instead questioned the things we wanted changed, and in one case, not modifying what we asked them to. For example, in the first budget, we decided that in our main bathroom, we wanted to have an 2m long 30mm thick sink. This was very expensive. For the second budget, we asked them to change the sink to a 1.8m long 10mm thick sink. Instead, HTH changed it to a 1.6m sink. Why? We asked for a 1.8m!!
If it took so long to get the response in the first place, and now the corrections haven't been made correctly, how long will it take to get the next reponse?
My view at the moment with HTH is this. I think they make really nice kitchens, but they are perhaps a bit overpriced. Also, as you can maybe hear, they take some time to respond to emails. And I can understand why they have questioned some of our changes, because perhaps they want to double check we are making the right decisions. But why not call and ask before sending out a new budget, which now needs to be corrected again!
Anyway, I am still looking forward to finalising our kitchen, as I think it will look nice when done. But I'm glad we have until the end of January 2015 to sort this all out...
Meeting with Hesselund - The electrician
So it was time to have a meeting with the electrical company doing the installation for our new house. Where should we have all our plug sockets, light switches etc? Yes, more decisions need to be made!
We had a meeting with Hesselund A/S in the beginning of September 2014, where they had sent us a 2D drawing of our house with a standard electrical layout prior to the meeting. From this, we could choose all the extra sockets, lights, sensors, internet cables etc we wanted. However, we had a limit of 15,000dkk. Did this go very far? In short, no!
15,000dkk does not buy you very much at all. We received the quotation from Hesselund approximately one week later, and we could see that everything that we wanted came to 24,000dkk! This was quite a bit over our budget, and whilst we were looking through the list of what we had added to the standard installation, we found it very hard to pull things out of the quotation...
After a lot of head scratching, we removed a couple of spot lights from outside, a couple of switches, two tube lights from the garage (Hesselund wanted stupid money for something we could buy ourselves for a quarter of the price) and the tv aeriel socket in the bedroom was replaced by an empty tube in the wall (so we could add a tv socket ourselves later on). After sending this to Hesselund, this reduced the budget to 17,800dkk. Not quite 15,000dkk, but much better than 24,000dkk!
More information on the electrical installation can be seen on the drawings page here.
We had a meeting with Hesselund A/S in the beginning of September 2014, where they had sent us a 2D drawing of our house with a standard electrical layout prior to the meeting. From this, we could choose all the extra sockets, lights, sensors, internet cables etc we wanted. However, we had a limit of 15,000dkk. Did this go very far? In short, no!
15,000dkk does not buy you very much at all. We received the quotation from Hesselund approximately one week later, and we could see that everything that we wanted came to 24,000dkk! This was quite a bit over our budget, and whilst we were looking through the list of what we had added to the standard installation, we found it very hard to pull things out of the quotation...
After a lot of head scratching, we removed a couple of spot lights from outside, a couple of switches, two tube lights from the garage (Hesselund wanted stupid money for something we could buy ourselves for a quarter of the price) and the tv aeriel socket in the bedroom was replaced by an empty tube in the wall (so we could add a tv socket ourselves later on). After sending this to Hesselund, this reduced the budget to 17,800dkk. Not quite 15,000dkk, but much better than 24,000dkk!
More information on the electrical installation can be seen on the drawings page here.
Wednesday, 1 October 2014
Details of the brick work for the kitchen step
One of the last details we needed to finalise, was to decide what we wanted to do with the brick work in the corner where the living room meets the kitchen. We knew that we wanted to have a step of some kind, and we would need to allow for this step in the brick work. So the best thing to do, being an engineer myself, was to draw up the house in CAD!!
Here is what we decided to do with the brickwork where the living room meets the kitchen. A rounded corner step, which sticks out 1m.

Below is a screenshot showing how the house looks on the ground. The grey area, which surrounds the house, represents the height of a flattened off area, as delivered by the building company. But as we want the builders to prepare an area for the patio, I've also added that to the drawing. It makes sense for them to prepare the patio for us, whilst they are out there with their machines. Plus, it's less work we have to do! Drawings like this, really are the only way to get an idea of what the ground will look like when delivered by the builders, plus we can describe to them exactly how we want the patio, how we want the path around the house, and how we want the driveway.
Here is what we decided to do with the brickwork where the living room meets the kitchen. A rounded corner step, which sticks out 1m.
Below is a screenshot showing how the house looks on the ground. The grey area, which surrounds the house, represents the height of a flattened off area, as delivered by the building company. But as we want the builders to prepare an area for the patio, I've also added that to the drawing. It makes sense for them to prepare the patio for us, whilst they are out there with their machines. Plus, it's less work we have to do! Drawings like this, really are the only way to get an idea of what the ground will look like when delivered by the builders, plus we can describe to them exactly how we want the patio, how we want the path around the house, and how we want the driveway.
Subscribe to:
Posts (Atom)